PROJECT: CYCLE LANE NEXT TO THE A-2233 ROAD, K.P. 13+900 TO 21+600 (EUROVELO). SECTION: LOS CAÑOS-BARBATE (CÁDIZ)”.
CONTRACTOR: Secretaría General Técnica. Consejería de Fomento, Infraestructuras y Ordenación del Territorio
STARTING DATE: September 2.022
DATE OF COMPLETION: In progress
BUDGET: 3.354.285,99 €.
DESCRIPTION:
The works consist of the construction of a cycle lane attached to the A-2233 road, 7.7 km long, which will connect the towns of Los Caños de Meca and Barbate. To this end, a 4.5 m wide platform will be built on the right-hand side, consisting of a 0.9 m hard shoulder, a 0.6 m concrete safety barrier, a 2.5 m cycle lane and a 0.5 m cycle safety berm on which a wooden railing will be placed. We highlight the construction of a subway that will cross the platform at KP 1+450, which will consist of a 3×3 m2 prefabricated concrete frame. The road surface section will be made up of 25 cm of artificial gravel followed by two layers of bituminous concrete (6+8 cm) AC16 Surf/Bin 35/50 S. The surface will be crowned by a surface treatment of cycle lane made up of polyurethane mortar and acrylic resins.
The action will be completed with the execution of signage (horizontal and vertical) and signposting (both by means of wooden barriers and concrete bollards and New Jersey), as well as the extension of the existing drainage works and the execution of concrete-lined ditches.