“ROAD IMPROVEMENT AZÁNGARO SAYTOCOCHA-SANDIA-SAN JUAN DE ORO SECTION II MUÑANI SAYTOCOCHA SECTOR III (PROGR 30 + 000 TO 56 + 356), REGION OF PUNO”

CONTRACTOR: REGIONAL GOVERNMENT OF PUNO CEDE CENTRAL

START DATE: May 2017

BUDGET: 34,909,069.00 Peruvian Soles

DESCRIPTION:

The project is located north of the department of Puno between the provinces of Sandia, San Antonio de Putina and Azángaro. The projected section has a length of 25,986 km, and has a width of 6 m with a berm of 0.75 m each side, in which and in order to improve the functionality of the road, the necessary work movements are carried out of earth (excavation and embankment fill), as well as the execution of the new pavement package, consisting of a base layer of granular material 0.15 m thick, a sub base of 0.2 m thickness and a layer of asphalt agglomerate hot 5 cm thick. Likewise, the works include the works of transversal drainage, the longitudinal drainage, as well as the elements of signaling and beaconing of the necessary way to improve the passability of the vehicles between the communicated populations, elevating their socioeconomic activity