ADAPTATION OF THE CANAL DEL VIAR FOR THE ROUGHING AND CLEANING OF WATER FOR THE MODERNIZATION OF IRRIGATION OF THE VIAR. ALCALÁ DEL RÍO (SEVILLE)

CONTRACTOR: COMMUNITY OF REGANTES OF THE REGAR AREA OF THE VIAR.

START DATE: March’15

BUDGET: € 1,000,828.52

DESCRIPTION:

With the main purpose of eliminating foreign bodies, algae and particles in suspension in the Canal del Viar, getting on the one hand to avoid problems in pumping and filters, and on the other to enable the direct discharge of clean water to the networks of gravity without fear that these are obstructed, will be installed two large grilles of roughing in the current channel located before the direct intake with the pumping station of Herreros and Alamillo, two sections of cleaning channel will be built, in by-pass, in both zones parallel to the current layout of the Main Canal del Viar as well as a spillway in the Main Canal upstream of the roughing grate in the Alamillo area.