“IMPROVEMENT OF WATER SUPPLY AND SEWAGE IN COMPLEX ZOFRATACNA, TACNA REGION”
CONTRACTOR: MINERA SOUTHERN PERU
START DATE: August 2017
BUDGET: 10,611,052.59 Peruvian Soles
DESCRIPTION:
The work is located inside and outside the complex of Zofra Tacna, where PVC pipes for water will be installed, such as conduction and impulsion lines, a 750m3 reservoir and pumping station will be built and the corresponding residential connections, in the same way it will be done for the renovation of the sewerage networks and the existing one will be connected. The works aim to improve potable water and sewerage networks of the Zofra Tacna complex.