PROJECT: EXECUTION OF WORKS ASSOCIATION OF DISCHARGES UNDER THE KERNELS GUADALHORCE: ALORA, PIZARRA AND COIN (MALAGA)
CONTRACTOR: ENVIRONMENT AGENCY AND WATER. MINISTRY OF ENVIRONMENT AND LAND OF THE BOARD OF ANDALUSIA
TIMEFRAME: 25-12-2015
BUDGET: 5.030.460,38 €
DESCRIPTION:
The works involve the construction of two major collectors. The Collector 1 (Álora- blackboard WWTP), with a length of 15,741.4 meters, which collects spills and Coin Alora and gravity and pressure leads to the proposed treatment plant, located in the Municipal District of Blackboard. As for the Collector 2 (EDAR COIN-), with a total length of 9411.6 meters, part of the connection to a built and operated collector that collects the discharge of Coin and ends near the confluence of the streams and Low shroud. In the second catcher, waste water are driven by gravity to the connection with the manifold 1 prior to arrival at the WWTP. In the section on gravity pipes corrugated High Density Polyethylene is used, with smooth high density polyethylene in the stretch drive.