PROJECT: EDAR GENERAL TO COLLECTORS OF OSUNA (SEVILLA).

CONTRACTOR: EGMASA

DEADLINE: APRIL 2010

IMEFRAME: 8 MONTHS

BUDGET: 3503957,17 €

DESCRIPTION:

Osuna general collectors will have a first tranche driving GRP diameter 500 of about 500 m. length, a second tranche of GRP 1500de 2120 meters and a final section on reinforced concrete frame 1500×2500 of about 980 meters. Connection to the sewage is included.