PROJECT: CONDITIONING OF THE MARITIME RIDE OF LA RÁBITA (GRANADA).

CONTRACTOR: DIPUTACIÓN DE GRANADA

START DATE: May 2015

BUDGET: € 155,324.60

DESCRIPTION:

The works to be carried out will basically consist in the modification of the paving of the seafront of the town of La Rábita by means of the use of hexagonal shaped concrete tiles. Likewise, the irrigation network will be operated, and a supply pipeline for drip irrigation will be projected. Likewise, the lighting network will be installed, installing a total of 50 points of light. The project includes the construction of a new edge with the beach, without eliminating the existing one, through the placement of modular concrete benches.