“CONDITIONING OF THE HONDO ARROYO IN THE URBAN AREA OF MONTURQUE (CÓRDOBA)”

CONTRACTING: CONFEDERACIÓN HIDROGRÁFICA DEL GUADALQUIVIR

START DATE: September 2018

TERMINATION DATE: JUNE’19

BUDGET: 252,423.98 €

DESCRIPTION: 

The works consist of channeling the Arroyo Hondo as it passes through the town of Monturque, through the execution of a rectangular section of reinforced concrete, thus achieving the maximum capacity of the channel compatible with the drainage work to which it flows. To do this, the widening of the channel between the facades of existing buildings and the regularization of the longitudinal slope is expected. Likewise, the action includes the cleaning of the channel with removal of mud both upstream and downstream of the action.