PROJECT: “CENTER OF RESOURCES, LEARNING AND RESEARCH IN THE RURAL ENVIRONMENT IN OSUNA (SEVILLA)”
CONTRACTOR: FRANCISCO MALDONADO DE OSUNA FOUNDATION
START DATE: June’16
DATE OF TERMINATION: December´18
PEC: € 5.161.777,38€
DESCRIPTION:
The building consists of a semi-basement, ground floor, first and second floor, articulated around a large central space, which crosses it in all its height that houses the main access from the exterior porch located to the east, and illuminates through of a glass cover protected from sunlight. In these plants the classrooms, library, study rooms, cafeteria-dining room, seminars, assembly hall, and offices will be distributed. In order to protect the building from solar incidence, the hollows of the eastern and western façades with adjustable slats will be protected, protecting the south façade by means of a latticework of horizontal concrete slats.