PROJECT: WORK OF GROUPING OF DISCHARGES FROM DÍLAR TO EDAR LOS VADOS (GRANADA). FASE 3. LOTE Nº 2.

CONTRACTOR: Consejería de Agricultura, Ganadería, Pesca y Desarrollo Sostenible. Dirección General de Infraestructuras del Agua

START DATE: To be confirmed.
DATE OF COMPLETION: In progress
BUDGET: 7.174.410,76 €

DESCRIPTION:

The works consist of the construction of a network of collectors to collect the waste water from the municipalities of Alhendín, Otura and Las Gabias up to the point of connection with the Otura collector to the Los Vados waste water treatment plant. The collectors will be made of reinforced concrete pipes, mostly with diameters of between 1000 and 1500 mm, and with PVC pipes of between 400 and 500 mm diameter in the case of smaller branches (Otura branches). In addition, 5 spillways and 3 ditches will be built to overcome the crossings with the GR-30, the N-323 and the GR-3303 roads. The standard sections of the trenches are all shored, with a 10 cm sand bed and sand backfill up to 30 cm above the pipe generatrix, which is filled with selected soil up to the level of artificial gravel, which will have a thickness of 30 cm.