PROJECT: CYCLE LANE ON THE A-395 (RONDA SUR), GRANADA

CONTRACTOR: Dirección General Técnica. Consejería de Fomento, Articulación del Territorio y Vivienda.

START DATE: April 2.023

DATE OF COMPLETION: In progress

BUDGET: 1.065.564,53 €.

DESCRIPTION: The objective of the works to be carried out is the creation of a bicycle lane that will link the Granada Health Technology Park with the municipality of Huétor Vega, next to the Serrallo Tunnels. The section, which will run parallel to the Ronda Sur de Granada (A-395), will have a length of 2,177.00 m, and will have a wooden footbridge of about 27 metres in span and 4.5 m wide, with which the Monachil River will be crossed. The structure will be supported on two abutments of 2.40 m and 2.00 m high, founded with pile caps on Ø 180 mm micropiles. The standard section of the cycle lane is 2.50 m wide plus 1.80 m of pedestrian path for the first 450 m, followed by the wooden footbridge, and then a 2.50 m wide section of cycle lane. The pavement section will have a wearing course (AC16 Surf S or HF-35 on the footbridge) and a 2 cm thick slurry colouring layer.

The works are completed with the execution of longitudinal drainage (ditches) and extension of transversal drainage works, signalling and signposting as well as the execution of planting and installation of bicycle racks and pedestrian crossings that can be overpassed.