PROJECT: Work Emergency Stabilization of several hillsides with network cables, bolting and shotcrete as well as withdrawal of several landslides, cleaning and repairing nets triple twist in the road A-347 pp.kk. from 2 to 7 TT.MM. Adra and Berja (Almeria).

CONTRACTOR: Giasa

DEADLINE: October 2011

TIMEFRAME: 6 MONTHS

PBUDGET: 1928495,2 €

DESCRIPTION:

WORK IN THE STABILIZATION OF SLOPES WITH MULTIPLE NETWORK CABLES, bolting and shotcrete, AND WITHDRAWAL OF VARIOUS DETACHMENTS, CLEANING AND REPAIR OF MESH TRIPLE TWIST, ROAD A-347. Pp.kk. 2 TO 7 TT.MM. And BERJA ADRA (ALMERIA). Also contained JETTY WALLS AND SCREENS MICROPILOTES.