PROJECT: SUPPLY, SANITATION, PAVING AND LIGHTING IN C / GRANADA, BEAS DE GRANADA

CONTRACTOR: DIPUTACION OF GRANADA

DEADLINE: December 2013

BUDGET: 57.537,48 €

DESCRIPTION:

The works involve the renewal of existing sewer and supply as well as the execution of a pipeline for low voltage lighting to bury existing airlines. The sewage system is projected in PVC, improving the hydraulic capacity of an already impaired driving. The supply network replaces an old network of low capacity and projected onto pipe high density polyethylene sectioned by gate valves. All connections are accessible with facade by records and shutoff valves. The renovation of the road is completed with the execution of a reinforced concrete slab with a central water line cobblestone. In order to improve the accessibility of the area steeper, this is completely covered with cobblestones.